Construction Update #4: Floors
Posted by KarahAs you can see above, the crew is moving fast with the construction. As of this afternoon, one cabin (the Chipp/Chick staff cabin) had the floor completely done and another (the Chick cabin) was well under way. If it doesn’t rain the next few days (as is forcasted) then all the new cabins should have finished floors by the end of the week!
Posted in News | Tagged Camp Crestridge, Crestridge construction, floors, New Cabins, Ridgecrest Summer Camps | Leave a reply
Concrete, Concrete and more Concrete!
Posted by KarahThe cabins are definitely coming along fast. This morning the concrete truck arrived once again. The columns have been finished on all the cabins and now it’s time to have more concrete poured into them. We’re adding as much stability as possible because we know all the crazy antics that go on inside the cabins! Here you can see the concete being poured into the Chipp/Chick cabin:
And here’s what it looks like on the other two hills:
Next week, the framing of the cabins should begin. I wish everyone could be here to see it happening in person. Since that isn’t the case though, keep checking back for updates. We’re doing our best here at camp to document as much as possible!
Posted in News | Tagged Camp Crestridge, Columns, Crestridge construction, Footers, New Cabins, Ridgecrest Summer Camps | Leave a reply
Construction Update #3: Footers and Columns
Posted by SharonThe ground has been cleared, footer holes dug and now in goes the concrete. Below are pictures of the staff cabin on Chipp/Chick hill with finished footers poured!
After seeing how well things were going at this cabin, we walked on over to Cheyenne/Choctaw hill to see if we could witness the concrete actually being poured. We were in luck, and the construction crew even let Sharon get in on the action! Here is Sharon’s ready stance:
Wait for it…here comes the concrete:
Good job Sharon! Now she can add construction work to the list of her many talents!
Columns have also begun to pop up. Only one cabin has them so far, but by the end of the week, weather permitting, all of the block columns should be in place. Here is a picture of the staff cabin with a few columns.
Abby got a closer look for inspection.
I hope you’re as excited as we are to see the progress. Keep checking back to see all the action!
Posted in News | Tagged Camp Crestridge, Crestridge construction, Footers, New Cabins, Ridgecrest Summer Camps | Leave a reply
Construction Update #2
Posted by SharonThe construction crew is moving right along and staying busy. At this point, the huts have been cleared, exact cabin measurements and placement have been marked, and the holes for the footers have been dug. Within the next day or two, they will pour the footers.
As you can see above, the Village Director huts have been torn down to be replaced by camper cabins and a staff cabin.
The yellow strings indicate the size and height of the cabin. The wood also marks off the site of the cabin. The last picture was taken from the bottom of Choctaw hill looking up at where the new cabins will be.
The new cabins will be 18×30 plus a 10 ft. covered porch. To give you a better idea, they will be the same size as a Chippewa cabin. The good news is that eventually all the existing cabins will be this size and have covered porches. That is something to look forward to for all you Cheyennes and Choctaws!
Keep checking back for more updates and pictures!
Posted in News | Tagged Camp Crestridge, Crestridge construction, New Cabins, Ridgecrest Summer Camps | Leave a reply
Construction Update #1
Posted by SharonWe’ve finished step one of the construction project! The land has been cleared for the five new cabins. Now all we have to do is build them! Ron, Phil, and I have ordered the materials, taken construction classes, and have gotten our hard hats. We’re ready to build!
Well, I’m glad that’s a joke or else no one would want to sleep in those cabins. We are in the process of finalizing contracts and getting those signed. Once finished, the footers will go up! It won’t be long till we will hear pounding, sawing, and all those construction sounds. Check out the pictures to see the latest view. To see a larger image, click on the picture.
This space, along with the hut, will be used for a Staff cabin
This will be a Chickasaw cabin
The space where the hut is will be a new cabin.
The orange flags mark the start of the new cabin, built in place of the hut.
This space, right below the hut, will be a new cabin
This space, right above Boulder Junction and
across from Choctaw 2, will be a new cabin
This space along with the hut will be a new Cherokee cabin
As you can see, we are making great progress which is very exciting! Continue to check back to get more updates.
Posted in News | Tagged Cabin Restoration, Camp Crestridge, Crestridge construction, New Cabins, Ridgecrest Summer Camps | Leave a reply
Ground Breaking News
Posted by SharonWell, after several months of praying, planning, meeting with contractors, more praying, more planning, and more meetings with contractors, we’ve finally taken it to the next step! As of Wednesday, September 24th, we officially began clearing the land for the new cabins. It is all very exciting but also a little scary at the same time. There’s no turning back now! The leaders of Ridgecrest Summer Camps truly believe this is the direction God is leading us in. We will now have the opportunity and privilege of impacting 400 extra campers between both camps each summer! What an honor! My goal is to give you weekly updates about the construction that may include pictures and short video clips. So please check back regularly!
Looking down the hill at Chickasaw 3.
If you have the time, please visit our “Give” page to see how you and your family can get involved with the project.